QA/QC for flanged joints

Training and qualified personnel must assemble flanged joints in hazardous materials piping systems (see Appendix A of ASME PCC-1). Consideration should be given to establishing a finished joint examination process as part of the facility’s QA/QC assurance program.  A leak or failure in a piping system can be a minor inconvenience for low-consequence fluids, or it can become a potential source of a process safety incident for higher-consequence fluids depending on…

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here
Scroll to Top