When a facility’s hazardous materials piping is assembled with bolted flanged joints, it needs a maintenance procedure to properly assemble and disassemble these flanged joints. Along with this procedure, a means to pressure/leak test the bolted flanged joint must be used to ensure leak tightness. Subject to code/regulatory requirements, the worker should establish: