In some recent PHA’s for a client I have seen a pattern in some general assumptions that PHA teams should not be making, but often do. It involves the “consequences” for scenarios such as “LOSS of ELECTRICTY”. The catch is that there is a general assumption that with a “LOSS of ELECTRICTY” that everything shuts...