PHMSA is issuing this Advisory Bulletin to inform owners and operators of gas transmission pipelines that if the pipeline pressure exceeds maximum allowable operating pressure (MAOP) plus the build-up allowed for operation of pressure-limiting or control devices, the owner or operator must report the exceedance to PHMSA on or before the fifth day following the...