2/4/2015 UPDATE After many lengthy discussions with engineers and inspectors I have come to the conclusion that although this practice may be permitted by code, albeit by a five-word phrase in an interpretation, most engineers stated they would NOT use a dual stamped vessel unless it was careful analyzed via a PHA or detailed engineering...