Changing the configuration of a space may also require a different energy isolation plan

pre bundle removal

In many industries where the heating or cooling process comes into play, the process will probably have some type of heat exchanger or condenser. In large-volume processes, these units can be enormous; easily large enough to bodily enter and do assigned work. But many of these units may not get identified as a Permit-Required Confined Space (PRCS) during the site evaluation because of their design; however, every once and a while, these units have their “tubes/bundles” pulled and thus, we go from a “nothing space” to a PRCS that needs a Danger Sign and a different energy isolation plan. Let me explain…