On December 31, 2008, a welder was preparing to conduct TIG welding on a 2″ X 65″ run of pipe located in the vent trunk compartment of an aluminum vessel under construction. The estimated height where the pipe entered the compartment was about 1.5′ from the bottom of the deck.