Is the “maintenance bay” on a new winder machine a PRCS?

PRCS maint. bay2

We came across this space while performing other safety and health work for a client.  The client we were working for is not the owner of the equipment, but a recent near-miss occurred and the host and client wanted to ask us about this space and the near-miss.  This piece of equipment is very large and fast-moving and this new design has placed all the power transmission devices inside an enclosure for “1-stop shopping”, as stated by the maintenance manager.  We were all in agreement that LOTO was certainly applicable to enter the space, but in the near-miss, a manufacturer’s rep was overcome by a cleaning product while working inside.  Before we knew of this near-miss, it took me all of 3 seconds to declare this space a Permit-Required Confined Space…

NOTE: use the 36″ barrier height for a comparison of the door size…

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here
Scroll to Top