An arc flash occurred in an energized 600-volt, 3-phase main distribution center installed in a shipping container to provide temporary power to a building under construction. A mobile crane attempted to remove the container before the underground utility lines had been disconnected, and the internal bus bars twisted until contact between phases resulted in a line-to-line short.
Facts and Evidence: