Safety Info Posts

Impaired Driving

  Impaired Driving Info DUI and NO Seatbelt Accident Scene Photos One Page Awareness Raisers used in 2007 Campaign What is Impaired Driving and What can we do about it? Tips for Party Givers Driving home the facts about Impaired Driving Driving home the facts about blood alcohol concentration Driving home the facts about ZERO…...

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here

Impaired Driving Read More »

Weekly Safety Talks

November Week 1 November Week 2 November Week 3 November Week 4 December Week 1 December Week 2 December Week 3 December Week 4 January Week 1 January Week 2 January Week 3 January Week 4 February Week 1 February Week 2 February Week 3 February Week 4 March Week 1 March Week 2 March…...

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here

Weekly Safety Talks Read More »

Techniques for assigning a Target Safety Integrity Level (SIL)

If your company is planning an expansion, retro-fit, grass roots facilities, or simply modifying a process unit, and the process hazard analysis (PHA) indicates you need a safety instrumented system (SIS) as a protective layer, then you need to comply with ANSI/ISA S84.01. Why? Because in February 1996, the “Application of Safety Instrumented Systems for…...

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here

Techniques for assigning a Target Safety Integrity Level (SIL) Read More »

Post Weld Heat Treating (PWHT) failure

This was a new pressure vessel that failed during its hydro test following its fabrication.  The vessel’s Post Weld Heat Treatment was not properly conducted, when some parts of it did not reach the required temperature.  Coupled with a small hydrogen crack, the failed post weld heat treatment was sufficient to cause catastrophic failure while…...

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here

Post Weld Heat Treating (PWHT) failure Read More »

ASME and Hot Bolting and Half Bolting Procedures

First, let’s define what this article is all about.  Has your facility ever had a leaking flange?  Just a tiny drip of liquid or a small release of gas?  What is the most common response to this leaky flange?  Someone goes out and tightens the flange bolts to stop the leak.  This practice is done…...

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here

ASME and Hot Bolting and Half Bolting Procedures Read More »

Re-Submitting your RMP

RMPs MUST be updated at least once EVERY five (5) years. Owners and operators responsible for RMP implementation should review the factsheet A Checklist for Submitting your Risk Management Plan (pdf). This factsheet provides a checklist to consider in updating and resubmitting RMPs. Use EPA’s RMP*eSubmit for your resubmissions. For additional information see the RMP*eSubmit Users’…...

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here

Re-Submitting your RMP Read More »

RMP Facilities in the United States as of December 2009

Under the Clean Air Act, Section 112(r), the EPA established a program requiring facilities possessing greater than certain threshold quantities of 140 chemicals to provide risk management plans to the EPA.1  As part of this reporting requirement, facilities are required to determine the worst-case scenario release from a single chemical process, using EPA criteria and guidelines.2 Facilities…...

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here

RMP Facilities in the United States as of December 2009 Read More »

Establishing a Reporting Culture (Psychological Safety)

It cannot be assumed that workers will naturally begin to report problems, errors, and near misses once a just environment is in place. There are a number of organizational as well as psychological barriers that must be hurdled before a reporting culture can be put in place.   The first barrier to overcome is… Membership Required...

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here

Establishing a Reporting Culture (Psychological Safety) Read More »

Externally vs. Internally illuminated EXIT signs

In older facilities, we see illumination for an exit sign coming from an external source.  Section 1013.6 of the IBC regulates the graphics, illumination, and emergency power supply for such signs. Although no particular color is specified for exit signs, it is REQUIRED that the color and design of the signs, the lettering, the arrows,…...

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here

Externally vs. Internally illuminated EXIT signs Read More »

Reason’s 3 C’s

Three (3) ingredients are vital for driving the safety engine, all of them the province of top management or what the organizational theorist, Mintzberg, has termed the strategic apex of the system. These driving forces are: commitment, competence and cognizance Reason’s three C’s…. Membership Required You must be a member to access this content.View Membership...

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here

Reason’s 3 C’s Read More »

De-enerizing Stored Energies

Take any of the following steps below that may be necessary to guard against stored energy(s) left in the equipment after it has been shut down and isolated from its energy source(s)…. Membership Required You must be a member to access this content.View Membership LevelsAlready a member? Log in here...

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here

De-enerizing Stored Energies Read More »

A reverse look at Facility Siting and Change Management

An older post, with updates…Ever since the 2005 BP Texas City tragedy, refineries and chemical plants have been working diligently to review “facility siting” risks for their facilities.  As with all of the PSM elements, many of us took this new focus as a learning opportunity.  We had all done something we called “facility siting”…...

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here

A reverse look at Facility Siting and Change Management Read More »

Scroll to Top