How far would you go with the “co-Location” coverage to determine PSM/RMP coverage?

This summer we saw a 300,000-gallon water tank fail which pushed a generator into a covered process which led to a release of the HHC/EHS. The questions I wish to pose are:

  1. Should the water tank have fallen under the PSM/RMP program due to its proximity to the covered process?
  2. Should the proximity of the water tank be part of the facility siting assessment in the PHA?

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here
Scroll to Top