Line Break gone bad (Butane w/ improper energy isolation)

Butane LB EO

An operator was working to remove a pressure gauge on what was assumed to be depressurized tubing. The upstream piping the pressure gauge tubing was connected to had been isolated, de-pressured and air-gapped so that this section of line was positively and physically isolated from the process. However, during the work to isolate the process...

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here
Scroll to Top