ASME PCC-1 offers training guidance for personnel assembling and disassembling flanged joints

A RAGAGEP, which is often overlooked for pipe flanges but is fair game for OSHA and EPA to reference, is ASME PCC-1, Guidelines for Pressure Boundary Bolted Flange Joint Assembly.  The RAGAGEP outlines the training personnel needs to safely assemble and disassemble flanged joints in hazardous material(s) piping circuits.  A facility with flanged piping should seriously consider adopting these training requirements for the QA/QC in its piping MI program.  These are the recommended requirements for the training, qualification, duties, and responsibilities of:

  • Qualified Bolting Specialists,
  • Qualified Senior Bolting Specialists, and
  • Qualified Bolting Specialist Instructors

engaged in the assembly and disassembly, including inspection and quality assurance, of

(1) pressure vessel pressure-boundary bolted joints

(2) piping pressure-boundary bolted joints

(3) storage tank pressure-boundary bolted joints

Additional supplemental qualifications may be obtained on the basic training to extend the qualifications, duties, and responsibilities to include:

(1) powered equipment

(2) heat exchanger pressure-boundary bolted joints

(3) special pressure-boundary bolted joints