Episode 122 – Bryan Haywood – Permit and Non-Permit Required Confined Spaces

This was a brief 30-minute chat with my friend and longtime supporter @ SAFTENG on the topic of Permit-Required Confined Spaces.  This first episode was just the basics, but I explain how a confined space is DEFINED and how that confined space becomes a Permit-Required Confined Space (PRCS).  We then discuss the three (3) entry options:  (c)(5), (c)(7), and (d)-(k), and many of the pros and cons that come with each entry option.

 

Scroll to Top