Pneumatic Pressure Testing gone bad (20″ NG line)

On March 3, 2009, at approximately 1:29 p.m., Employees #1 and #2 were conducting a gas line pressure test on a 20-inch gas line.

The test involved pressurizing the line to 100 psi and holding this pressure for one (1) hour.

This test was conducted to determine whether the gas line being tested could be reused or needed to be replaced.

During the test, the pipe failed under the pressure.