PSM/RMP “co-location” or “proximity” when determing PSM/RMP Applicability

UPDATED on 5/31/11 to answer some specific questions I received over the holiday weekend…Scenario:  A process that is covered under PSM/RMP (a toxic liquefied gas under pressure) is in very close proximity to a propane system that is used solely as an on-site fuel. The propane system had always been exempted using the PSM exemption of materials used solely as a fuel and the Fuels Regulatory Relief Act under RMP.

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here
Scroll to Top