Crushed Between Stotler/Elevator

            Date: 12/20/02 What Happened? Crew completed running 3 1/2 tubing in the well and was in the process of stripping off the BOPE (Stotler).  The crew stripped the BOP up off the wellhead and installed slips under the stotler.  The stotler remained on the stup in the slips.  Crew worker unlatched the tubing...

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here
Scroll to Top