On May 3, 2006, Employee #1 was in a trench (approximately 37″ deep and 44 to 46″ wide), digging dirt from around a 10″ diameter PVC water pipeline to locate a water leak. The pipeline was pressurized to approximately 125-130 psi with compressed air.