Pressure/leak testing “closure welds” (345.2.3)

If we are making a final “tie-in” weld between two segments of pipe that have already been independently pressure tested, that specific weld can be exempt from a final system pressure test if:

It is a butt weld.

It undergoes 100% RT or UT.

It undergoes an in-process examination (visual inspection of fit-up and passes).
Scroll to Top