Coverage: National
Period: 30 days, 3/19/15 to 4/18/15
New Inspections: Opened in the last 30 days = 570
Closed Inspections: Closed in the last 30 days = 1,235
Ongoing Inspections: Opened prior to 30 day reporting period and still not closed = 110,342
Inspections with Violations = 129
Inspections with no Violations = 441 (Based on number of New Inspections only)
Assessed Penalties= $0.3M (Assessed Penalties for violations issued under New Inspections only)
Inspection Types:
Planned Inspections: 310 (54%)
Complaint: 79 (14%)
Referrals: 75 (13%)
Follow-Up: 37 (6%)
Un-Prog Related: 37 (6%)
Other: 32 (6%)
Issued…
16 Willfuls
1,111 Serious
27 Repeats
680 Other than serious
NAICS: Top Ten
236220: Commercial and Institutional Building Construction (52)
238130: Framing Contractors (22)
238160: Roofing Contractors (22)
237110: Water and Sewer Line and Related Structures Construction (15)
332710: Machine Shops (14)
238170: Siding Contractors (13)
236115: New Single-Family Housing Construction (except Operative Builders) (12)
611110: Elementary and Secondary Schools (12)
236116: New Multifamily Housing Construction (except Operative Builders) (11)
337110: Wood Kitchen Cabinet and Countertop Manufacturing (10)
