The defendant is the operator of a facility that handles, stores, and uses anhydrous ammonia in its industrial refrigeration system.

GENERAL ALLEGATIONS

At all relevant times, Defendant maintained a refrigeration system at the Facility and that system utilized, processed, handled, or stored anhydrous ammonia, a “regulated substance” under CAA Section 112(r)(3). EPA conducted an inspection of the Facility on July 21, 2014 (the “Inspection”). As a result of what was observed at the Inspection or the review of documents provided at the time of the Inspection or thereafter, EPA identified a number of violations of the CAA, as communicated to Defendant in a letter, dated September 23, 2015.

Defendant’s process is not eligible for Program 1 under 40 C.F.R. § 68.10(b) because the distance to a toxic endpoint for a worst-case release assessment is greater than the distance to a public receptor. Defendant’s process is subject to requirements of 40 C.F.R. Part 68 found at Subpart D – Program 3 Prevention Program, under 40 C.F.R. § 68.10(d), because it is not eligible for Program 1 and is also subject to the OSHA process safety management standards set forth in 29 C.F.R. § 1910.119, which apply to any process which involves a chemical at or above a threshold quantity, which, in the case of anhydrous ammonia, is 10,000 pounds.

 

VIOLATION OF 40 C.F.R. § 68.25(a) Failure to Properly Perform Worst-Case Release Calculations

40 C.F.R. § 68.25(a) requires Defendant to develop a worst-case release accidental release scenario that is estimated to create the greatest distance in any direction from the Facility that ammonia would be present in the atmosphere at 0.14 mg/L.

40 C.F.R. § 68.25(b) provides that the quantity of the worst-case release of ammonia shall be based on the greater of, (1) for substances in a vessel, the greatest amount held in a single vessel, taking into account administrative controls that limit the maximum quantity, or (2) for substances in pipes, the greatest amount in a pipe, taking into account administrative controls that limit the maximum quantity.

The worst-case scenario set forth in Defendant’s June 13, 2011 Risk Management Plan for the Facility, which was in effect at the time of the Inspection, assumed a release of 11,500 pounds and a release rate of 300 pounds/minute. If the 11,500-pound release figure was correct, the Defendant should have assumed a release rate of 633 pounds/minute. Although Defendant provided EPA with a revised worst-case analysis in August 2014, which assumed a release of 11,355 pounds and a release rate of 625 pounds/minute, Defendant’s Risk Management Plan submitted in June 2016 assumed an 11,500-pound release and a release rate of 300 pounds/minute.

The Defendant’s use of an incorrect release rate in the June 2011 Risk Management Plan and the June 2016 Risk Management Plan resulted in an incorrect determination concerning the greatest distance from the facility that ammonia would be present in the atmosphere at 0.14 mg/L or more during a worst-case release scenario. Underestimating a worst-case release impact area can affect the adequacy of emergency response planning.

 

VIOLATION OF 40 C.F.R. § 68.65

40 C.F.R. § 68.65 requires that Defendant document that the equipment used in its ammonia refrigeration processes comply with recognized and generally accepted good engineering practices (“RAGAGEP”) or, for existing equipment designed and constructed in accordance with codes, standards or practices no longer in general use, determine and document that the equipment was designed, maintained, inspected, tested and operating in a safe manner.

In light of the hazards posed by the mishandling of anhydrous ammonia, industry trade associations have issued standards for the ammonia refrigeration industry. For example, the International Institute of Ammonia Refrigeration (“IIAR”) publishes bulletins and guidance documents for ammonia refrigeration systems, including, without limitation:

  • IIAR Bulletin 109, Guidelines for IIAR Minimum Safety Criteria for a Safe Ammonia Refrigeration System (1997)
  • IIAR Bulletin 114, Guidelines for Identification of Ammonia Refrigeration Piping and System Components (1991)

IIAR, in collaboration with the American National Standards Institute (“ANSI”), also issues “American National Standards” for ammonia refrigeration systems, including, without limitation, Equipment, Design, and Installation of Closed-Circuit Ammonia Mechanical Refrigerating Systems (ANSI/IIAR 2-2008 (Add. B 2012).

The American Society of Heating, Refrigerating and Air-Conditioning Engineers (“ASHRAE”), in collaboration with ANSI, also issues refrigeration standards, including, without limitation, the “Safety Standard for Refrigeration Systems” (“ANSI/ASHRAE Standard 15-2013”).

Other organizations have also published guidelines for the safe operation of various processes. The American Society of Mechanical Engineers published guidance concerning the Identification of Piping Systems (“ASME A13.1-2007”).

The National Fire Protection Association published a fire protection code (“NFPA 1 Fire Code 2012”). These standards and guidance represent RAGAGEP at the time of the Inspection. Some of the standards and guidance have been updated since then.

As alleged below, the business failed in a number of instances to meet the RAGAGEP standards in effect as of the Inspection. Moreover, to the extent that any of the allegations relate to existing equipment designed and constructed in accordance with codes, standards or practices no longer in general use as of the date of the Inspection, on information and belief the business had not determined and documented that such equipment was nevertheless designed, maintained, inspected, tested and operating in a safe manner.

 

Inadequate Labeling on Piping and Valves

RAGAGEP provides that a facility identify all piping in connection with an ammonia refrigeration process with respect to content and direction of flow, at sufficient intervals on straight piping runs to readily allow identification, and place labels close to valves, flanges, changes in direction, and branches. See, e.g., ANSI/ASHRAE 15-2013 § 11.2.2; ANSI/IIAR 2-2008 (Add. B 2012) § 10.6; ASME A13.1-2007 § 3; IIAR Bulletin 109 § 4.7.6 (1997); IIAR Bulletin 114 (1991).

During the Inspection, EPA inspectors determined that Defendant had inadequate labeling on piping and inadequate tagging of valves including, but not limited to, inadequate labeling of King Valve #2 in the machinery room, which was not labeled as a king valve, and inadequate labeling of certain ammonia pipes in the machinery room, certain components of the chilled water system, certain ammonia piping on the perimeter of the Facility, and the ammonia charge line.

 

Inadequate Signage on Doors Leading to Machinery Room and Concerning Identification of Ammonia Refrigeration System

RAGAGEP provides that a facility have a sign on all entrance doors to the ammonia refrigeration machinery room restricting entry to authorized personnel and to have other informative signs and emergency signs in accordance with NFPA 704. E.g., ANSI/ASHRAE 15-2013 § 11.2.4; ANSI/IIAR 2-2008 (Add. B 2012) §§ 13.1.2.4 and 13.1.10.4. RAGAGEP also provides that a facility have a permanent sign displaying the name and address of the installer of the ammonia refrigeration equipment, the refrigerant number and the amount of refrigerant in the system, the lubricant identity and amount, and the field test pressure applied. E.g., ANSI/ASHRAE 15-2013 § 11.2.1; IIAR Bulletin 109 § 4.10.4.

During the Inspection, EPA inspectors determined that (a) the two main doors leading to the machinery room lacked NFPA hazard placards, (b) the three other doors leading to the machinery room lacked all necessary signage, and (c) the sign inside the primary entrance to the machinery room failed to identify the type of lubricant and the amount used.

 

Failure to Have Adequate Access to Ammonia Charge Line

RAGAGEP provides that a facility provide a clear and unobstructed approach and space for inspection, service, and emergency shutdown of all serviceable components of refrigeration machinery. E.g., ANSI/ASHRAE 15-2013 §§ 8.3, 9.12.1; ANSI/IIAR 2-2008 (Add. B 2012) § 13.1.2.2.

During the Inspection, EPA inspectors observed that the ammonia charge line exited the building directly above a large electrical cable tray supporting wires from electrical transformers, leaving no clear pathway for an ammonia supplier to access the charge line for charging and unloading.

 

Failure to Adequately Seal Pipes Leading Out of Machinery Room

RAGAGEP provides that a facility tightly seal all pipes that pierce the walls of the machinery room. E.g., ANSI/ASHRAE 15-2013 § 8.12(f); ANSI/IIAR 2-2008 (Add. B 2012) §§ 13.1.1.6, 13.1.5.2.

During the Inspection, EPA inspectors observed that certain piping entering the machinery room was not tightly sealed to the walls.

 

Failure to Have Audible and Visual Alarms Inside the Machinery Room or Near the Entrance Doors to the Machinery Room

RAGAGEP provides that a facility provide visual and audible alarms inside the machinery room and outside each entrance to the machinery room. E.g., ANSI/ASHRAE 15-2013 § 8.11.2.1; ANSI/IIAR 2-2008 (Add. B 2012) § 13.2.1.2; NFPA 1 Fire Code 2012 §§ 53.2.3.1.2 and 53.2.3.1.3.

During the Inspection, EPA inspectors observed that there were no visual or audible alarms inside the machinery room or near the entrance doors to the machinery room.

 

Failure to Adequately Label Certain Isolation Valves and to Provide Access to One of Those Valves with an Appropriate Permanent Work Surface

RAGAGEP provides that a facility provides prominent and easily readable identification of all main shut-off valves (king valves) and that all such king valves shall be readily accessible and operable, either directly or via a chain, from a permanent work surface. E.g., ANSI/ASHRAE 15-2013 §§ 9.12.6, 11.2.2; IIAR 2-2008 (Add. B 2012) § 13.1.2.3; IIAR Bulletin 109 § 4.10.3; NFPA 1 Fire Code § 53.2.4.2.

During the Inspection, EPA inspectors observed that three isolation valves for the High-Temperature Receiver in the machinery room were not labeled as required and that one of these valves was not readily accessible from a permanent work surface.

 

Failure to Have a Quick-Closing Valve on Line from Oil Pot to High-Temperature Receiver

RAGAGEP provides that a facility have a self-closing or manual quick-closing emergency stop valve connected to the oil drain point for any vessel equipped with an oil drain. E.g., ANSI/IIAR 2-2008 (Add. B 2012) § 14.2.3.

During the Inspection, EPA inspectors observed that there was no self-closing or manual quick-closing emergency stop valve on the drain line from the oil pot located at the High-Temperature Receiver.

 

Failure to Locate Pressure Release Valve at Least 20 Feet from Inlet Air Ductwork

RAGAGEP provides that a facility locate the pressure release valve not less than 20 feet from any ventilation opening. See, e.g., ANSI/ASHRAE 15-2003 § 9.7.8; ANSI/IIAR 2-2008 (Add. B. 2012) § 11.3.6.3; NFPA 1 Fire Code § 53.2.3.3.12.

During the Inspection, EPA inspectors observed that the pressure release valve was located less than 20 feet from the ventilation inlet.

 

Failure to Equip the Machinery Room with Self-Closing and Tight-Fitting Doors

RAGAGEP provides that a facility equip the machinery room with tight-fitting doors that are self-closing if they opened into the building. E.g., ANSI/ASHRAE 15-2013 §§ 8.11.12, 8.12(d); ANSI/IIAR 2-2008 (Add. B 2012) §§ 13.1.10.1, 13.1.10.2.

During the Inspection, EPA inspectors observed that certain machinery room doors were not tight-fitting and that certain doors that led into other parts of the building were not self-closing.

 

Failure to Have Adequate Air Circulation in the Machinery Room

RAGAGEP provides that a facility provide air circulation in the machinery room so that inlet air replaces air being exhausted. RAGAGEP also provides that the machinery room have air openings for inlet air positioned to avoid recirculation of exhaust air and air inlets positioned in areas where refrigerant from a leak is unlikely to concentrate, in consideration of the location of the replacement air paths, refrigerating machines, and the density of the refrigerant relative to the air. E.g., ANSI/ASHRAE 15-2013 § 8.11.4; ANSI/IIAR 2-2008 (Add. B 2012) § 13.3.3.2.

During the Inspection, EPA inspectors observed that the machinery room ventilation system was not designed to provide a sufficient sweep of fresh air near machinery and to avoid recirculation of exhaust air (due to locating the air inlet on the outside wall in close proximity to an exhaust vent.)

 

Failure to Have a Shower and Eye Wash Station Outside the Principal Machinery Room Door

RAGAGEP provides that a facility have an eyewash station and body shower external to the machinery room and readily accessible via an exit. E.g., ANSI/IIAR 2-2008 (Add. B 2012) § 13.1.6; IIAR Bulletin 109 § 4.10.10.

During the Inspection, EPA inspectors observed that Defendant did not have an eyewash station and a body shower located outside the machinery room in close proximity to the exit door.

 

VIOLATION OF 40 C.F.R. § 68.67 Failure to Identify Earthquakes as an Incident with a Potential for Catastrophic Consequences

40 C.F.R. § 68.67 required Defendant to perform a process hazard analysis (“PHA”) to identify, evaluate, and control the hazards involved in the process including, without limitation, identify issues related to the siting of the facility.

During the Inspection, EPA reviewed Defendant’s PHA and Risk Management Plan from 2011 as well as a PHA from 2014 and determined that Defendant had failed to identify earthquakes as posing a potential risk even though the Facility is located in an area designated as at moderate risk for earthquakes.

 

VIOLATION OF 40 C.F.R. § 68.69 Failure to Have Adequate Standard Operating Procedures for Ammonia Delivery

40 C.F.R.§ 68.69 required Defendant to develop and implement written operating procedures that provided clear instructions for safely conducting activities involved in each covered process and that addressed steps for each operating phase, including emergency shutdown operations and emergency operations.

During the Inspection, EPA inspectors reviewed the facility’s “Ammonia Refrigeration System Bulk Delivery Charging Procedure” and determined that it did not include all the required elements, including procedures for each operating phase (such as emergency shutdown operations or emergency operations), operating limits, and safety and health considerations.

 

VIOLATION OF 40 C.F.R. § 68.73 Failure to Calibrate Ammonia Detection System at Frequency Recommended by Manufacturer

40 C.F.R. § 68.73 required Defendant to (a) establish and implement written procedures to maintain the on-going integrity of process equipment, including, (b) inspect and test process equipment based on RAGAGEP and with a frequency consistent with manufacturer’s recommendations and good engineering practices, and more frequently if determined necessary by prior operating experience, (c) document each inspection, and (d) correct deficiencies outside acceptable limits.

After the Inspection, Defendant provided documents to EPA indicating that Defendant had calibrated its ammonia detection systems on an annual basis, despite the manufacturer’s recommendation that the calibration is performed every six months.

 

Failure to Adequately Maintain Piping on Roof of Facility

RAGAGEP provides that a facility apply primer-paint coating systems on areas of piping with an elevated risk of corrosion to provide pipe insulation with low thermal conductivity and low vapor permeability. RAGAGEP also provides that a facility inspect uninsulated piping and, if corrosion is found, to clean the pipe to bare metal and paint with a rust preventive paint (or replace the pipe if badly corroded). RAGAGEP also provides that insulated piping showing signs of vapor barrier failure should have the insulation removed and piping inspected. E.g., ANSI/IIAR 2-2008 (Add. B 2012) App. H §§ H.6 and H.7; IIAR Bulletin 109 §§ 4.7.4 and 4.7.5.

During the Inspection, EPA inspectors observed rusting on ammonia piping on the roof of the Facility and multiple sections of piping insulation covered with algae growth and missing insulation caps, thereby exposing the piping and insulation to moisture.

 

VIOLATION OF 40 C.F.R. § 68.81 Failure to Adequately Document Actions Taken to Prevent Recurrence of Incident That Could Have Resulted in Catastrophic Release of Ammonia

40 C.F.R. § 68.81 required Defendant to (a) investigate each incident that could reasonably have resulted in a catastrophic release of ammonia, (b) prepare a report at the conclusion of such investigation, (c) have the report reviewed by all affected personnel whose job tasks are relevant to the incident findings, and (d) promptly address and resolve the report findings and recommendations and document any resolution and corrective action.

Based on an Incident Investigation Report Form provided by Defendant to EPA, there was an ammonia release from a malfunctioning valve on the roof of the Facility on March 22, 2014. Defendant determined that the problem was caused by a loose packing nut, and Defendant determined that the inspection schedule for valves should be revised to call for the inspection and tightening of manual valve packing nuts every six months. However, Defendant had no documentation indicating that the proposed corrective action was in fact implemented.

 

VIOLATION OF 40 C.F.R. § 68.95 Failure to Comply with Emergency Response Program Requirements of 40 C.F.R. § 69.95 at a time When Defendant Was Not Included in Community Emergency Response Plan and When Defendant Did Not Include Required Emergency Contacts in its Own Emergency Response Plan

Under the version of 40 C.F.R. § 68.90 that was in effect at the time of the Inspection, Defendant was exempt from the emergency response program requirements of 40 C.F.R. § 68.95 only if (a) Defendant’s employees were not expected to respond to accidental releases of regulated substances, (b) Defendant was included in the community emergency response plan developed under 42 U.S.C. § 11003, and (c) appropriate mechanisms were in place to notify emergency responders when there is a need for a response.

During the Inspection, EPA inspectors determined that Defendant was not in compliance with the requirements of 40 C.F.R. § 68.95. EPA inspectors also determined that although Defendant’s employees were not expected to respond to accidental releases of regulated substances, Defendant was not included in the community emergency response plan and did not include in its Emergency Response Plan MassDEP’s 24-hour emergency number, or contact information for the National Response Center.

 

The United States, respectfully prays that this Court provides the following relief:

Order Defendant to pay a civil penalty for violations of Section 112(r)(7) of the CAA in the amount of $37,500 per day for each violation that occurred from January 12, 2009 through November 2, 2015 and in the amount of $99,681 per day for each violation that occurred on or after November 2, 2015.

 