EPA issues RMP citations @ refinery (Flammables, $47K, & fire and two minor injuries)

Respondent owned and operated the petroleum refining facility which produces, processes, stores, or handles more than the threshold quantities of flammable substances. Respondent’s hydrocracker unit (HCU) is a covered process under Program 3 of the RMP regulations.

On April 10, 2020, there was an incident at the facility. One of the facility’s covered processes was in operation when an operator determined that a Pressure Safety Valve (PSV) was not seated properly. After discussions with the control room and the arrival of a senior operator, the facility undertook a procedure to reseat the PSV.  The procedure indicated that the pressure UPSTREAM of the PSV should be abated by closing an UPSTREAM valve. The PSV could then be reseated.

However…