At approximately 4:00 a.m. on March 29, 2020, an employee, 30, was installing a full face blind on a flange on a reactor. Then, the probe stem fell inside of the reactor, and the employee tried to fish it out. Using a Jacobs ladder, the employee entered the unprepared reactor that was not cleared for entry because the reactor still contained vinyl chlorine.