Bryan Haywood

Managing your Relief Valves

I asked some ChemEs and MEs the following questions about relief valve testing. We come across some RV programs and practices that we feel fall short of following any RAGAGEPs and thought it would be helpful to hear from engineers who manage these programs on a daily basis. Here is my scenario, and their responses

Liquid Penetrant Examination (NBBI)

by Jim Worman, Senior Staff Engineer with The National Board of Boiler and Pressure Vessel Inspectors If you have contractors or on-site engineers doing pressure vessel inspections, this is one method they may choose. This article is VERY WELL written and is a MUST READ for those not formally trained in this method of inspection.

36 incidents & 3 updates (2/27/11)

Story of Interest Workman who vanished eight years ago was gassed and crushed in fridge recycling machine INDUSTRIAL OIL FIELD FATALITY Seguin man killed in West Texas oilfield accident (an oilfield accident has killed a worker, 44, who was crushed by some pipes he was trying to move – some pipes apparently slipped and he

33 incidents & 1 update (3/4/11)

Many THANKS to my NEW {amp}amp; RENEWING Corporate Partners in Safety! since 2/11 Electrical (2010 = 90) Forklift/Manlift t{amp}nbsp; (2010 = 110) Mining 32 (2009 = 586) 39 (2009 = 302) (2009 = 82) (2010 = 139) (2008 = 250) (2010 = 50) Trenching 6 (2009 = 48){amp}nbsp; (2008 = 90) 12 (2009 = 68)

Scroll to Top