Safety Info Posts

Sling inspection records

OSHA’s Slings Standard (29 CFR 1910.184) specifies several paperwork requirements, depending on the type of sling paragraph (e) of the Standard covers alloy steel chain slings; paragraph (f) covers wire rope slings; paragraph (g) covers metal mesh slings; paragraph (h) covers natural and synthetic fiber-rope slings; and paragraph (i) covers synthetic web slings) The purpose of each of

WA-OSHA has released its DRAFT language for its PSM Standard for Refineries

Last year we saw the state of California implement their “PSM for Refineries” standard and now the state of Washington’s Division of Occupational Safety and Health is releasing draft language for a new chapter that will ONLY apply to Process Safety Management (PSM) for petrochemical refining facilities.  This Process Safety Management rulemaking is in the

When piping pressure tests go bad

Case #1 At 10:15 a.m. on February 12, 2015, an employee was working from the elevated basket of a manlift, installing sheetrock in an area of the job site where water piping was undergoing pneumatic testing, at 130 psi. At the same time, another contractor was performing a compressed air leak test. An 80-pound section

This is why using your hazardous material to perform the pressure or leak testing is NOT a good idea

On June 29, 2005, Employee #1 was involved in the following the maintenance activities in the Chloropyridines Complex at the employer’s chemical manufacturing facility. Employee #1 was returning a reactor vessel to service. He was attempting to do a pressure and leak test using chlorine gas. The pipe was supposed to be pressure tested with

One Entrant, Two “would-be rescuers” Fatal PRCS Incident (2017, H2S, Sewer Pipe)

It is 24 years after OSHA promulgated it’s Permit-Required Confined Space standard and then in 2015 OSHA promulgated their Confined Spaces in Construction standard and yet we continue to see more “would-be rescuers” dying in Permit-Required Confined Spaces as do actual “entrants”.  We can only hope that one-day worker training and awareness will end the “would-be

2018 IFC changes the “leak detection” and “emergency shutoff” requirements for high hazard gases and liquids

I am not quite sure why they did this, but the ICC decided that the requirements for “leak detection” and “emergency shutoff” for high hazard gases and liquids ONLY apply when the “maximum allowable quantity per control” area is exceeded.  This was done by moving these requirements from Section 5003 where they applied to any quantity