Safety Info Posts

Does your ERP contain SPECIFICS?

A facility should develop an emergency response plan that SPECIFICALLY addresses release scenarios developed from their PHAs and historical accident information. The potential releases identified in the PHAs should be used in preparing the emergency response pre-plans. Planning and preparation should include:

WEED WHACKER SAFETY

DANGER: This power unit can be dangerous! This unit can cause serious injury or blindness to the operator and others. The warnings and safety instructions in the operator’s manual must be followed to provide reasonable safety and efficiency in using this unit. The operator is responsible for following the warnings and instructions in this manual

34 Incidents & 2 Updates (6/30/11)

MANY THANKS to my NEW & RENEWING “Partners in Safety”for their support! Fluor-B&W Portsmouth since 6/2011, Westinghouse since 2008, and Suzlon since 2009 2011 Fatality Tracker Electrical 31 (2010 = 90) (2009 = 100) Forklift/Manlift Mobile Equipment 47 (2010 = 110) (2009=88) Mining 126 (2010 = 480) (2009 = 586) Explosions 130 (2010 = 246)

Scroll to Top