Safety Info Posts

30 incidents & 1 update (4/25/11)

Many THANKS to my NEW & RENEWING Corporate Partners in Safety! since 2005 since 3/2011 2011 Fatality Tracker Electrical 14 (2010 = 90) (2009 = 100) Forklift/Manlift Mobile Equipment  31 (2010 = 110) (2009=88) Mining 66 (2010 = 480) (2009 = 586) Explosions 83 (2010 = 246) (2009 = 302) Cranes 14 (2010=50) (2009 =

Group LOTO Verification of ZES Requirements

A verification system is implemented to ensure the continued isolation and de-energization of hazardous energy sources during the course of maintenance and servicing operations. Once the equipment is shut down and the hazardous energy has been controlled, maintenance/servicing personnel, sometimes in conjunction with operations personnel, must test the machinery or equipment to verify that the

Scroll to Top