Knowing your Pressure Vessel Stamps/Forms

In process safety, we deal with a lot of pressure vessels and even some boilers. It took me years to understand the differences between the U-1, P-2, and P-3 forms and all the requirements for the placement and management of these pressure-retaining containers. This article is intended to help safety pros who may have to deal with these types of pressure-retaining containers; so this is a 30,000-foot view.

The U-1, P-2, and P-3 forms are standard reports used under the ASME Boiler and Pressure Vessel Code (BPVC) to document the design, construction, and certification of equipment. They serve as the “birth certificate” for a vessel, verifying that it was built and inspected in accordance with the Code.

ASME Form Comparison

FormTitlePrimary Use
U-1Manufacturer’s Data Report for Pressure VesselsUsed for a complete pressure vessel (Section VIII, Division 1). It covers the entire unit, including shells, heads, and nozzles.
P-2Manufacturer’s Data Report for ALL Types of BoilersUsed for complete power boilers (Section I), except for electric boilers and those of miniature construction.
P-3Manufacturer’s Data Report for Watertube BoilersSpecifically used for watertube boilers, their superheaters, waterwalls, and economizers.

  • U-1 falls under ASME Section VIII (Pressure Vessels). This covers equipment like heat exchangers, air receivers, and chemical reactors.
  • P-Series (P-2/P-3) falls under ASME Section I (Power Boilers). These are specifically for vessels used to generate steam or vapor at pressures exceeding 15 psig.

  • The U-1 is a comprehensive document for a single finished vessel. If a vessel is manufactured in parts by different shops, those shops would provide a U-2 (Partial Data Report), which is then attached to the master U-1.
  • The P-2 and P-3 are specific to the boiler industry. While a P-2 is more general for various boiler types, a P3 is tailored to the complex piping and tube headers found specifically in watertube designs.

  • U-1 forms are signed by the manufacturer and an Authorized Inspector (AI) and usually correspond with the “U” or “UM” stamp.
  • P-2/P-3 forms correspond with the “S” (Power Boiler) or “A” (Assembly) stamps.

When reviewing these for a mechanical integrity program, the U-1 is what you will most commonly encounter for process equipment. The P-series will almost exclusively be found in the boiler house or power generation areas of a facility.

Scroll to Top