Line Break Gone Bad @ Power Generation Facility (ZES of Steam could not be confirmed)

Two (2) maintenance men at an electric power generation plant removed a check valve cover from a steam system. The section of the steam line was isolated and tagged, but it could not be vented or drained first. The section was only partially depressurized when the cover was loosened. When the employees removed all fasteners holding the cover in place, it blew off, and the steam line sprayed the two employees with steam and hot water.

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here
Scroll to Top