CLICK HERE to Renew your Membership
CLICK HERE for a NEW Membership
CLICK HERE to see eligibility requirements for FREE Membership
If you have any questions, please contact me

I am proud to announce that SAFTENG and The Chlorine Institute have renewed our partnership for another year (through 2026).  Members of The Chlorine Institute receive a FREE SAFTENG membership.  If you qualify, please contact me

NOTE: Any trade group interested in becoming a partner with SAFTENG for your Member Companies, please reach out, and I can share the plan

SAFTENG has:

Many THANKS to my NEW Members and those who CONTINUE to support SAFTENG:

Since 2008
Since 2026
Since 2012
Since 2024
Since 2026
Since 2026
OneDigital | Resourcing Edge Since 2026
Since 2015
Since 2010
Since 2024
Since 2026
since 2012
Since 2024
Since 2010
LOTO1
Burns to the hands
    Hi Bryan, Here is a classic example of not having zero energy. This guy was going to clean a screen on a line that normally runs around 80 degrees. The screen is on the suction of a centrifugal pump. The screen plugged up, causing the pump to cavitate and heat up tremendously. He shut off the pump (which allowed the discharge line to back feed into the pump), closed the suction valve...
Read More
Arc Flash 03 2012
Arc Flash Incident (February 2012)
INESTIGATION is ON-GOING, but preliminary data suggest the following: … HomeRead More »
Read More
HAZCOM GHS
2012 HAZCOM GHS ppt from OSHA
Many THANKS to John Newquist, Assistant Regional Administrator at DOL-OSHA, for providing this presentation.  Click Here to download (pdf), Click Here to download (ppt)
Read More
How can I tell if my PV was Post-Weld Heat Treated (PWHT)?
On the ASME Form U-1 (Manufacturer’s Data Report for Pressure Vessels), the information regarding Postweld Heat Treatment (PWHT) is typically found in Line 14. … HomeRead More »
Read More
index.9
24 Incidents & 1 update (4/22/12)
MANY THANKS to my NEW & RENEWING “Partners in Safety”for their support! since 2012 since 2012 since 2007 since 2010 2012 Fatality Tracker Electrical 25 (2011 = 81) (2010 = 90) (2009 = 100) Forklift/Manlift Mobile Equipment 16 (2011 = 84) (2010 = 110) (2009 = 88) Mining 31 (2011 = 248) (2010 = 480) (2009 = 586) Explosions 45 (2011 = 218) (2010 = 246) (2009...
Read More
Are we overdoing procedures?
by Wynand Serfontein, Senior Scientist @ Sasol Technology (Pty) Limited In a safety management system, there is a constant battle to find the optimum balance between procedures and common sense.  On the one hand, both our educational systems and legal systems support a culture of procedures.  The educational system encourages written material to be studied and examinations to be written...
Read More
ASME B31 Quality Assurance Program for weldments
An ASME B31.3 welding quality assurance (QA) program must cover the full lifecycle of a weldment, from procedure qualification to final testing, to ensure structural integrity. It serves as a mandatory framework for contractors to demonstrate that their processes and personnel consistently meet the minimum safety requirements for process piping.  The QA program must include the following:...
Read More
dpi-bridge-pics211
2012 Photo of the Week #16 (PFAS Saves three more lives!)
Workers hang by their PFAS after the hydraulic arm of their under bridge inspection man lift collapsed.  Just another good reason to wear your PFAS when in a telescopic boom lift!  … HomeRead More »
Read More
Even if your under OSHA's PSM TQ of 10K, your state fire code may have a few surprises for the business (NH3)
With all the changes to Ammonia Refrigeration RAGAGEPs, many businesses forget that the IFC and their state fire code no longer cover refrigeration; they gave all that to IIAR. But since the IFC no longer covers refrigeration, how does NH3 get covered under the IFC? Is it flammable, toxic, or corrosive? … HomeRead More »
Read More
How many welds have to be visually inspected per ASME B31.3
In ASME B31.3, the number of welds that require visual inspection depends entirely on the Fluid Service Category designated for the piping system. Because visual inspection is the primary quality control method, the requirements are strict. For the vast majority of process piping (Normal Fluid Service), 100% of the completed welds must be visually inspected. … HomeRead More »
Read More
index.9
41 Incidents & 2 Updates (4/17/12)
MANY THANKS to my NEW & RENEWING “Partners in Safety”for their support! since 2012 since 2012 since 2007 since 2010 2012 Fatality Tracker Electrical 25 (2011 = 81) (2010 = 90) (2009 = 100) Forklift/Manlift Mobile Equipment 14 (2011 = 84) (2010 = 110) (2009 = 88) Mining 26 (2011 = 248) (2010 = 480) (2009 = 586) Explosions 45 (2011 = 218) (2010 = 246) (2009...
Read More
2012 Video of the Week #22 - Fall Protection Demo
EXCELLENT Fall Protection video to incorporate into our training programs. The video does an great job of showing the forces involved in a fall and how the deceleration devices work! It also shows the forces applied to a guardrail when worker tie off to one (keeping in mind that a guardrail is only designed for a force of 200 pounds!).
Read More
1 655 656 657 658 659 766

Partner Organizations

Member Associations

Scroll to Top