- The critical issue is that a proposed change’s direct and indirect effects on the control of hazards should be identified and assessed.
- Due to the greater potential consequences of an accident, major accident hazard sites should aim for greater reliability in their planning and decision-making.
- Avoid too many simultaneous changes, which may result in inadequate attention to some or all—phase changes whenever possible.
- Organizational change should be planned thoroughly, systematically, and realistically, similar to the processes for managing plant change.
- Two (2) aspects of the change need risk assessment:
- risks and opportunities resulting from the change (where you want to get to), and
- risks arising from the process of change (how you get there).
- Consult with staff (including contractors) before, during, and after the change—don’t overlook serious issues hidden among all the natural concerns.
- Ensure all essential tasks and responsibilities are identified and transferred to the new organization.
- Provide training and experienced support/supervision for staff with new or changed roles.
- Consider reviews of plans and assessments by independent internal or external experts – be prepared to face challenges.
- Remember that change can happen even to apparently static organizations, e.g., the effects of an aging workforce.
Source: https://www.hse.gov.uk/humanfactors/topics/orgchange.htm