Not everyone seemed comfortable turning over NH3 Refrigeration Codes and Standards to the IIAR. In November, Wisconsin updated its State Code on Mechanical Refrigeration. One of the requirements that caught my eye is the INSTALLATION INSPECTION documentation the state will require before issuing the operating permit:
(2) INSTALLATION INSPECTION.
… the following documents shall be made available for review during inspections under this paragraph:
- Welding procedure specification.
- Procedure qualification record.
- Welder performance qualification.
- Welder continuity record.
- Design calculations.
- Design plans for the piping system.
- Material test reports.
- Certificates of compliance.
Here are the applicable sections of the code:
Chapter SPS 345 – MECHANICAL REFRIGERATION
Subchapter I — Purpose, Scope and Application
SPS 345.10 Purpose and scope.
SPS 345.11 Application.
SPS 345.12 Local regulations.
Subchapter II — Definitions
SPS 345.20 Definitions.
Subchapter III — Administration and Enforcement
SPS 345.30 Installation registration.
SPS 345.31 Enforcement and inspections.
SPS 345.32 Permit to operate.
SPS 345.33 Reporting of accidents.
SPS 345.34 Petition for variance.
SPS 345.35 Compliance responsibilities.
SPS 345.36 Appeals.
SPS 345.37 Penalties.
SPS 345.38 Fees.
Subchapter IV — Standards
SPS 345.40 Design, construction and operation.
Subchapter V — Changes, Additions or Omissions to ANSI/ASHRAE Standard 15
SPS 345.500 General.
SPS 345.501 Scope.
SPS 345.503 Definitions.
SPS 345.508 Eye wash and shower.
SPS 345.509 Design and construction.
SPS 345.511 General requirements.
SPS 345.550 ANSI/ASME B31.5.
Subchapter VI — Changes, Additions or Omissions to ANSI/IIAR 2
SPS 345.600 General.
SPS 345.601 Scope.
SPS 345.611 Overpressure protection.
SPS 345.613 Machinery room.
Source:
