EPA RMP Citations @ NH3 process – Program 2 (NH3 and $3,760)

On March 27,2013, EPA conducted a compliance inspection of Respondent’s facility to determine compliance with the Risk Management Plan (RMP) regulations promulgated at 40 C.F.R. part 68 under section 112(r)(7) of the Act. The EPA found that the Respondent had violated regulations implementing section 112(r)(7) of the Act by failing to comply with the specific…...

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here

EPA RMP Citations @ Refinery for late piping inspections ($112K)

On December 14,2010, through December 16, 2010 EPA conducted a partial compliance evaluation inspection of the refinery pursuant to Section 112 of the Clean Air Act, 42 U.S.C. §7414 to evaluate the Facility’s compliance with the requirements of 40 CFR Part 68.  Respondent uses a standard procedure for inspection of process piping systems titled Mechanical…...

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here

2013 Video of the Week #38 (Forklift – Why we never drive forward with obstructed view!)

WARNING!  This video may be upsetting to some viewers.  Viewer discretion is advised. PLEASE take notice that everyone in the area was wearing a Hi-VISIBILTY vest!  These ONLY work when personnel can SEE the vests!  NOTHING replaces following safety procedures…. Membership Required You must be a member to access this content.View Membership LevelsAlready a member?...

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here

A Message to my friends and co-workers about Fatigue, Rushing, Frustration, Complacency!

You matter to me my friend and I hope I matter to you If either of us gets injured we’ll both be feeling blue. Sometimes workers are tired as they perform their daily task,If you saw them cut corners, you’d speak up, right? Sorry, I had to ask. And if you were to see co-workers…...

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here

EPA RMP Citations @ Cold Storage facility (NH3 and $8K)

On March 7, 2013, EPA conducted a compliance inspection of Respondent’s facility to determine compliance with the Risk Management Plan (RMP) regulations promulgated at 40 C.F.R. part 68 under section 112(r)(7) of the Act. The EPA found that the Respondent had violated regulations  implementing section 112(r)(7) of the Act by failing to comply with the…...

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here

NH3 Refrigeration Auto Purger Design Change

It has come to our attention that some manufacturer(s) have changed the design of their auto purgers by installing a Relief Valve (RV) with the package.  The owner’s manual of the component specifically lists the RV as a pre-assembled component and requires the installation of a “vent line” on this RV.  This seems to be…...

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here

Are you tired of pressure testing your process piping after the pressure boundary has been breached?

Are you tired of spending thousands of dollars on high-cost nitrogen to pressure test your process piping?  Are you tired of all the procedural documents you must have in place to perform this testing?  And all of the training you must do for the personnel performing this testing?  Well, I have a special deal for…...

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here
Scroll to Top