Trick Question or legit question for PSM Compliance? Contractor Evaluations and PRCS Rescue Evaluations

OK, PSM requires us to evaluate our “contractors” who will be working on, in or adjacent to a covered process. OSHA’s Permit Required Confined Space Standard also comes into play during a PSM audit (see .119(f)(4)). Under the PRCS std. OSHA requires us to “evaluate” our rescue services (.146(k)(1)(i)-(ii)) using something similar to Appendix F

Staffing and Management of Change

OSHA and EPA are now citing for not doing MOCs on personnel changes!  The debate rages on for those living in the PSM/RMP world. Just this week, a client called me to help them with an audit finding they received in a third-party audit. The auditor wrote the finding that they were not considering personnel

Isolation for Reclassification of Permit-Required Confined Spaces

There is a lot of confusion on reclassifying Permit-Required Confined Spaces to Non-Permit Spaces, which is allowed on spaces with NO KNOWN or POTENTIAL hazardous atmospheres. 1910.146(c)(7) covers this practice. The key DIFFERENCE between “reclassifying” a space using section (c)(7) and using “alternative entry methods,” which is covered under section (c)(5) is ELIMINATION vs. CONTROL.

23 incidents & 1 update (3/23/11)

Many THANKS to my NEW & RENEWING Corporate Partners in Safety! since 2007 since 2011 since 2009 since 2/11 2011 Fatality Tracker Electrical 6 (2010 = 90) (2009 = 100) Forklift/Manlift Mobile Equipment  27 (2010 = 110) (2009=88) Mining 43 (2010 = 480) (2009 = 586) Explosions 48 (2010 = 246) (2009 = 302) Cranes

NEVER saddle a dead horse!!! HUH?

“Never saddle a dead horse” means that when using your Crosby clips, the “U Bolt” is ALWAYS over the DEAD part of the cable and NEVER on the part of the cable that will see the load applied to it.  In other words, NEVER have the u-bolt over the load side of the cable. Here

What is a RAGAGEP?…and what it is NOT

“Recognized And Generally Accepted Good Engineering Practice” (RAGAGEP) – are engineering, operation, or maintenance activities based on established codes, standards, published technical reports or recommended practices (RP) or a similar document. RAGAGEPs detail generally approved ways to perform specific engineering, inspection or mechanical integrity activities, such as fabricating a vessel, inspecting a storage tank, or