What must be in my Emergency Action Plan (EAP)?

At a minimum, the plan must include but is not limited to the following elements [29 CFR 1910.38(c)]: Means of reporting fires and other emergencies Evacuation procedures and emergency escape route assignments Procedures to be followed by employees who remain to operate critical plant operations before they evacuate Procedures to account for all employees after

Do I Need an Emergency Action Plan?

In most circumstances, immediate evacuation is the best policy, especially if professional firefighting services are available to respond quickly. There may be situations where employee firefighting is warranted to give other workers time to escape or to prevent danger to others by the spread of a fire. In this case, you as the employer are

Grouping equipment for purposes of conducting periodic LOTO inspections

Some companies develop an elaborate generic energy control procedure and supplement the generic procedure with checklists or appendices to address various distinct machinery and equipment in their facilities. This type of procedure and those described above may be considered a single energy control procedure (instead of multiple procedures) for inspection purposes if all of the

LOTO Machine Specific Procedures

OSHA says we are to have machine-specific LOTO procedures (note that there is an exception to this requirement, but in my scenario, it is not relative). In these procedures, we have to identify the following: the types of energy, their magnitudes, the means/methods to isolate and the means/methods to verify zero energy state (ZES) for

31 incidents & 1 update (3/20/11)

Many THANKS to my NEW {amp}amp; RENEWING Corporate Partners in Safety! since 2007 since 2011 since 2009 since 2/11 2011 Fatality Tracker Electrical 5 (2010 = 90) (2009 = 100) Forklift/Manlift Mobile Equipment{amp}nbsp; 27 (2010 = 110) (2009=88) Mining 43 (2010 = 480) (2009 = 586) Explosions 45 (2010 = 246) (2009 = 302) Cranes

Car Seal Program and Relief Valves

We do not see these types of failures often, but when we do, it can almost always be traced back to human error.  Back in 2008, a tube-and-shell heat exchanger catastrophically failed when workers accidentally closed two different valves at two different times between the vessel and its relief valve. On June 10, 2008, operators

How to use your PHA to write your SOPs

Does the title make you scratch your head? I usually get some strange looks when working with a client who is trying to understand what the PSM compliance cycle looks like. To start with, let’s look at what OSHA/EPA requires in our operating procedures: 1910.119(f)(1)(ii) Operating limits 1910.119(f)(1)(ii)(A) Consequences of deviation 1910.119(f)(1)(ii)(B) Steps required to