A team of auditors identified a potential risk associated with bypassed safety devices and inconsistent interpretation of regulations after multiple incidents of noncompliance were issued, associated with the operator’s failure to comply with 30 CFR 250.869 and 30 CFR 250.870 in 2025. The BSEE Performance-Based Risk Inspection (PBRI) covered five assets (all production platforms) in the GOAR, which five separate operators operated. What BSEE’s PBRI Found:
