36 incidents & 0 updates (3/4/15)

    Over 12,000 exclusive unsafe acts/conditions and accident/injuries photos and over 1,100 ppt’s & doc’s from more than 2,782 contributors!   2015 Fatality Tracker Electrical 9 (2014 =55) (2013 = 32) (2012 = 68) Forklift/Aerial 6 (2014 = 60) (2013=62) (2012 = 52) Mining* 8 (2014 = 401) (2013=87*) (2012 = 92*) *ONLY developed […]

What influences human performance?

Here we were in 2015, and still, we have far too many businesses still focusing on active failures and ignoring the latent failures impacting their significant incidents.  This approach is the LAZY approach to incident investigation. It also misses the mark on corrective action plans, which almost ensure the organization will not learn from the

Understanding the “Maximum allowable quantity per control area”

The maximum allowable quantity per control area is specified in Tables 5003.1.1(1) through 5003.1.1(4) of the IFC.  Tables 5003.1.1(1) through 5003.1.1(4) establish the maximum quantities allowed in a control area (see Section 5003.8.2 for design and protection requirements). If the quantity of chemicals used in a building does NOT exceed the maximum allowed per control

2015 Photo of the Week #9 (NH3 Placard)

Does anyone notice anything a bit odd about this shipment of HAZMAT?  Even though this is a problem, it is one of my proudest moments as a Safety Professional.  My 10 year old son spotted this on 275 here in our town of Milford, OH.  Can you spot the issue?  The answer is below photo…

Compliance Resource Tip… ecfr.gov

Recently OSHA.gov has been experiencing some serious issues and although it appears to have gotten almost back to normal, sometimes access to standards is lost.  And if you’re like me and do a lot of work in locations where there is no internet connection and you need the standards for a project, here is a

Consider the assumptions made during a PHA Facility Siting Assessment (Pipe Bridges)

I recently participated in a PHA for a large flammable liquids process and during the “facility siting” portion of the PHA we took a detailed tour of the process. During which, several significant “impact” hazards were identified. Of course, the long-time engineering manager (40 plus years of fine service at the facility) quickly went to the

31 incidents & 2 updates (2/24/15)

  Over 12,000 exclusive unsafe acts/conditions and accident/injuries photos and over 1,100 ppt’s & doc’s from more than 2,782 contributors! 2015 Fatality Tracker Electrical 9 (2014 =55) (2013 = 32) (2012 = 68) Forklift/Aerial 5 (2014 = 60) (2013=62) (2012 = 52) Mining* 8 (2014 = 401) (2013=87*) (2012 = 92*) *ONLY developed nations and