Chemical Process Safety (PSM/RMP)

No MOC for reduction of inventory to below PSM/RMP TQ leads to LPOC event (engineering out excess flow valves)

A number of years ago a former client decided that process safety was not worth the effort and wanted to get their process below the 10,000 pounds TQ for their LPG.  They hired a local architect/engineering firm that had no experience with the storage, handling, and processing of LPGs.  This “architect/engineering firm” advised the facility

Contractor Safety training at petroleum refining or petrochemical manufacturing facilities (WA-OSHA)

The department is initiating rulemaking to implement the advanced safety training requirements for High Hazard Facilities. Chapter 49.80 RCW, enacted in 2019, requires owners of petroleum refining or petrochemical manufacturing facilities to use a skilled and trained workforce when contracting for construction, alteration, demolition, installation, repair, or maintenance work. By January 1, 2022, all workers

Hazardous Locations: When, Where, and How

When most ordinary people hear the term “Hazardous Location” many conjure images of a dangerous location associated with typical hazards; however, when a safety engineer or engineer from the process industries hear the phrase we immediately elvate our antenna and sit up and pay close attention to what is being said.  But for those outside

Does ASME B31.1 require pressure/leak testing on PSV vent piping to atmopshere?

The requirement for pressure and leak testing on PSV vent piping depends entirely on whether the piping is classified as Boiler External Piping (BEP) or Non-Boiler External Piping (NBEP). If the vent line is part of the BEP (directly attached to the boiler safety valves under the jurisdiction of ASME Section I), the testing requirements

Canada’s Ammonia Refrigeration staffing requirements (Public Occupancies)

Canada has an interesting requirement for their NH3 refrigeration plants that operate within structures where the general public could be exposed to the NH3.  Since the promulgation of OSHA’s PSM standards in 1992, OSHA has shied away from even mentioning “staffing” for a covered process.  In the USA, we have plants that run 24/7/365 without

Line Break gone BAD (Chlorine)

We have yet another failure of enormous proportions.  When two workers, one of which is a Supervisor, are opening a liquid chlorine line and they have on supplied-air respirators without the regulator attached to the facepiece we have entered into the Twilight Zone.   WorksafeBC has levied a $318,707 fine against the city’s water-treatment plant for:

Scroll to Top