Chemical Process Safety (PSM/RMP)

Catastrophic Failure during pneumatic pressure test

Jan 26, 2006  – An accident occurred in a factory in Brazil during pneumatic pressure testing with air from pipework around a tank.  There were no blind flanges placed to isolate the pipework to the tank; only the valves were closed. Probably one or more valves failed or were not closed as the tank underwent…...

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here

Emergency Quench Systems for Polymerization Events

Imagine taking a snowball and rolling it down the side of Mount Everest. As the ball rolls down the mountain, it gets bigger and faster. If we can stop it early in its travel down the mountain, BEFORE it gets to BIG and FAST, we can save the town at the base of the moutain…....

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here

Understanding why “bonding and grounding” may not be enough protection when handling non-conductive flammable liquids

In the world of flammable liquids processing, we have two (2) types of flammable liquids: Members can read all my articles on how these flammable liquids get classified as “conductive” vs. “non-conductive. This post is to explain HOW and WHY the traditional “bonding and grounding” used in the transfer of flammable liquids may be inadequate…...

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here

Brittle Fracture (Catastrophic) Failure during HYDROTEST of Propane Bullet

I have posted numerous fatal accidents that occurred during the pressure testing of piping and pressure vessels.  Although hydrostatic testing involves less energy release should something fail vs. using pneumatic pressure, the hazard(s) are still HUGE and must be respected.  This incident involved a propane bullet built in 1994 and placed into service in 1996,…...

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here

Hydrostatic test of a cooling coil for an air-cooled heat exchanger fatality (OK-FACE)

A 43-year-old assemblyman died on May 26, 1999, from chest injuries he received earlier that day when struck by a high-pressure water jet emitted after the failure of a gasket during a hydrostatic test of a cooling coil for an air-cooled heat exchanger. At the time of the incident, the victim was part of a…...

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here

How often do hydrostatic relief valves (HRV) have to be changed or tested?

The frequency for testing or replacing hydrostatic relief valves (HRVs) depends largely on the service environment, the fluid being handled, and the specific regulatory standards like OSHA, NFPA, CGA, or ASME governing your process. Because these valves are designed to protect against thermal expansion in liquid-filled lines—often in “blocked-in” sections—their reliability is critical to preventing…...

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here

What is a process?

A process, in terms of Process Safety Management, is defined as:  “Any activity involving a regulated substance including any use, storage, manufacturing, handling or on-site movement of such substances, or any combination of these activities. For the purposes of this definition, any group of vessels that are interconnected, or separate vessels that are located such that a regulated substance could…...

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here

Fire Watch for your roofing contractor may have a 2-hr requirement

One of the debates we routinely have with fellow process safety professionals is the adoption of NFPA 51B vs. meeting 1910.252(a) requirements for their Hot Work safe work practice. I am a huge fan of NFPA 51B, as it is much more up-to-date than OSHA’s 1910.252, which, by the way, was based on the first…...

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here

Massive Leak of Liquefied Chlorine Gas (Henderson, NV 1991)

A massive leak of liquefied chlorine gas created a dangerous cloud of poison gas over the city of Henderson, Nevada, in the early morning hours of May 6, 1991. Over 200 persons were examined at a local hospital for respiratory distress caused by inhalation of the chlorine, and approximately 30 were admitted for treatment. Some…...

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here

Pressure/leak testing “closure welds” (345.2.3)

If we are making a final “tie-in” weld between two segments of pipe that have already been independently pressure tested, that specific weld can be exempt from a final system pressure test if:… Membership Required You must be a member to access this content.View Membership LevelsAlready a member? Log in here...

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here

The advantage of utilizing a Contractor Work Permit

Those of us living within the realm of Process Safety Management know all too well the difficulty of controlling contractor work activities to a level that we are confident they are not increasing our process risks beyond our acceptable levels. Many contractors are offended by the fact that many PSM programs have multiple layers of…...

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here
Scroll to Top