Safety Info Posts

H2 industrial piping requires 100% VT on welded/brazed joints (ASME B31.12)

I have written many articles relating to ASME B31.3 and the QA/QC requirements each weld/flange must meet.  However, in B31.12, Table IP-10.4.2-1 Required Nondestructive Examinations, the code requires 100% VT (Visual examination).  The code goes on to require a more extensive examination sampling of 5-10% joints using with Liquid Penetrant (PT) or Magnetic Particle (MT). 

Essential Features of the Emergency Plan (ASME B31.12)

Each operating company shall establish written procedures to minimize the hazard of an emergency. The procedures shall provide instructions to operating and maintenance personnel. The procedures shall describe the following: a process for prompt and adequate handling of all calls that concern emergencies, whether they are from customers, the public, employees, or other sources, and

OSHA’s Heat exposure standard

On April 24, 2024, the department’s Occupational Safety and Health Administration presented the draft rule’s initial regulatory framework at a meeting of the Advisory Committee on Construction Safety and Health. The committee, which advises the agency on safety and health standards and policy matters, unanimously recommended OSHA move forward expeditiously on the Notice of Proposed

ASME B31.12 – Leakage Survey

I have been working with several clients who are on a Hydrogen Fuel journey. It is fun to get deep into process safety protection schemes regarding NFPA 2 and ASME B31.12 and see the similarities and extra code requirements when dealing with large H2 gas systems. One of the interesting items regarding H2 piping is

EPA RMP citations @ repackaging facility (Cl2, SO2, Flammables & $261K)

Respondent is the facility’s owner and operator. The EPA inspected the Facility from July 27 to July 29, 2021, to determine the Respondent’s compliance with Section 112(r) of the CAAmand 40 C.F.R. Part 68 (“the Inspection”).  Operations at Respondent’s Facility include, among others, repackaging chlorine for utilization in sodium hypochlorite bleach manufacturing. The Facility also

Pressure Testing piping with N2 turns fatal

At 8:04 a.m. on May 11, 2023, an employee working for an oil and gas support services company was found dead. On 5/10/23, the night before, the employee had instructed his coworkers from other contractors to go home, and he would finish the job. This was the last time anyone had spoken to the employee

Scroll to Top