Post Weld Heat Treating (PWHT) failure

This was a new pressure vessel that failed during its hydro test following its fabrication.  The vessel’s Post Weld Heat Treatment was not properly conducted, when some parts of it did not reach the required temperature.  Coupled with a small hydrogen crack, the failed post weld heat treatment was sufficient to cause catastrophic failure while

Re-Submitting your RMP

RMPs MUST be updated at least once EVERY five (5) years. Owners and operators responsible for RMP implementation should review the factsheet A Checklist for Submitting your Risk Management Plan (pdf). This factsheet provides a checklist to consider in updating and resubmitting RMPs. Use EPA’s RMP*eSubmit for your resubmissions. For additional information see the RMP*eSubmit Users’

RMP Facilities in the United States as of December 2009

Under the Clean Air Act, Section 112(r), the EPA established a program requiring facilities possessing greater than certain threshold quantities of 140 chemicals to provide risk management plans to the EPA.1  As part of this reporting requirement, facilities are required to determine the worst-case scenario release from a single chemical process, using EPA criteria and guidelines.2 Facilities

Externally vs. Internally illuminated EXIT signs

In older facilities, we see illumination for an exit sign coming from an external source.  Section 1013.6 of the IBC regulates the graphics, illumination, and emergency power supply for such signs. Although no particular color is specified for exit signs, it is REQUIRED that the color and design of the signs, the lettering, the arrows,

Reason’s 3 C’s

Three (3) ingredients are vital for driving the safety engine, all of them the province of top management or what the organizational theorist, Mintzberg, has termed the strategic apex of the system. These driving forces are: commitment, competence and cognizance Reason’s three C’s.

Verifying my “ground” has less than 10 ohms resistance

Verifying that grounding and bonding systems meet a specific resistance threshold—such as the common 10 ohms target for flammable liquid processes—requires a systematic approach to ensure both accuracy and technician safety. The following procedure outlines the steps for performing a static ground-resistance test using a dedicated ground-resistance tester (Ohmmeter). This procedure applies to the periodic