Hazards of pneumatic pressure testing in terms of TNT energy

We have discussed the hazards of pneumatic pressure testing many times.  Pneumatic pressure testing should be a “last resort” for pressure testing process equipment.  But for those who question the degree of hazard this REQUIRED test brings about, here is something to consider.  Take a look at the following comparisons between the stored energy in piping systems and the equivalent stored energy in Dynamite (e.g., TNT):

  • 500 feet of 1″ pipe @150 psi = 1.6 ounces of TNT
  • 500 feet of 2″ pipe @150 psi =  8.0 ounces of TNT
  • 500 feet of 6″ pipe @150 psi =  5.0 pounds of TNT
Scroll to Top