CLICK HERE to Renew your Membership
CLICK HERE for a NEW Membership
CLICK HERE to see eligibility requirements for FREE Membership
If you have any questions, please contact me

I am proud to announce that SAFTENG and The Chlorine Institute have renewed our partnership for another year (through 2026).  Members of The Chlorine Institute receive a FREE SAFTENG membership.  If you qualify, please contact me

NOTE: Any trade group interested in becoming a partner with SAFTENG for your Member Companies, please reach out, and I can share the plan

SAFTENG has:

Many THANKS to my NEW Members and those who CONTINUE to support SAFTENG:

Since 2012
Since 2025
Since 2010
Since 2025
Since 2025
Since 2025
Since 2025
wrclp-fig2
NEVER saddle a dead horse!!! HUH?
“Never saddle a dead horse” means that when using your Crosby clips, the “U Bolt” is ALWAYS over the DEAD part of the cable and NEVER on the part of the cable that will see the load applied to it.  In other words, NEVER have the u-bolt over the load side of the cable. Here is a diagram and instructions from Crosby’s website showing the proper use of their clips....
Read More
What is a RAGAGEP?...and what it is NOT
“Recognized And Generally Accepted Good Engineering Practice” (RAGAGEP) – are engineering, operation, or maintenance activities based on established codes, standards, published technical reports or recommended practices (RP) or a similar document. RAGAGEPs detail generally approved ways to perform specific engineering, inspection or mechanical integrity activities, such as fabricating a...
Read More
History of SAFTENG's Incident Alerts
I am often asked why I do these publications and how did they get started.  Here is the history and reasoning behind the alerts.  The year was 1993.  Recent graduate and ready to save the world, my first job was at a ink resin plant in SW Louisiana.  PSM was red hot as it had just come out the year before.  What a great time to be getting into the safety field.  PSM really...
Read More
What must be in my Emergency Action Plan (EAP)?
At a minimum, the plan must include but is not limited to the following elements [29 CFR 1910.38(c)]: Means of reporting fires and other emergencies Evacuation procedures and emergency escape route assignments Procedures to be followed by employees who remain to operate critical plant operations before they evacuate Procedures to account for all employees after an emergency evacuation has been completed...
Read More
Do you need an EAP flowchart
Do I Need an Emergency Action Plan?
In most circumstances, immediate evacuation is the best policy, especially if professional firefighting services are available to respond quickly. There may be situations where employee firefighting is warranted to give other workers time to escape or to prevent danger to others by the spread of a fire. In this case, you as the employer are still required to have an EAP. To help you decide whether...
Read More
Fight or Flight
Should employees evacuate or be prepared to fight a small fire? … HomeRead More »
Read More
Ventilation...Can I use it to declassify a HAZLOC?
A lot of PSM/RMP covered processes utilize ventialtion as an engineering control within the process.  And if this is the case, then OSHA and EPA require the facility to have supporting documentation to show that the ventilation will do what it it intended to do. … HomeRead More »
Read More
Grouping equipment for purposes of conducting periodic LOTO inspections
Some companies develop an elaborate generic energy control procedure and supplement the generic procedure with checklists or appendices to address various distinct machinery and equipment in their facilities. This type of procedure and those described above may be considered a single energy control procedure (instead of multiple procedures) for inspection purposes if all of the criteria contained in...
Read More
LOTO Machine Specific Procedures
OSHA says we are to have machine-specific LOTO procedures (note that there is an exception to this requirement, but in my scenario, it is not relative). In these procedures, we have to identify the following: the types of energy, their magnitudes, the means/methods to isolate and the means/methods to verify zero energy state (ZES) for each source Suppose you or I go out to do our periodic LOTO inspection,...
Read More
Missed Preventive Maintenance Inspections/Tests
No hunman and no organization is perfect!  Although we should strive for perfection in all aspects of business (Production, Quality, Cost Control, and EHS), we often mis-step or possible loose our way altogether.  But how bad do things have to get before it is a REAL PROBLEM? … HomeRead More »
Read More
31 incidents & 1 update (3/20/11)
Many THANKS to my NEW {amp}amp; RENEWING Corporate Partners in Safety! since 2007 since 2011 since 2009 since 2/11 2011 Fatality Tracker Electrical 5 (2010 = 90) (2009 = 100) Forklift/Manlift Mobile Equipment{amp}nbsp; 27 (2010 = 110) (2009=88) Mining 43 (2010 = 480)...
Read More
Emergency Shutdown (when does it get activated)
I continue to see facilities struggle with the emergency shutdown SOP requirements and how it is all suppose to flow and fit into the daily operations.  In this post I will try and lay out a flow to help make sense of these PSM/RMP requirements.  I am hopeful you can learn from my mistakes, as I have learned this the hard way from many OSHA inspections and accident investigations. …...
Read More
1 688 689 690 691 692 725

Partner Organizations

Member Associations

Scroll to Top