CLICK HERE to Renew your Membership
CLICK HERE for a NEW Membership
CLICK HERE to see eligibility requirements for FREE Membership
If you have any questions, please contact me

I am proud to announce that SAFTENG and The Chlorine Institute have renewed our partnership for another year (through 2026).  Members of The Chlorine Institute receive a FREE SAFTENG membership.  If you qualify, please contact me

NOTE: Any trade group interested in becoming a partner with SAFTENG for your Member Companies, please reach out, and I can share the plan

SAFTENG has:

Many THANKS to my NEW Members and those who CONTINUE to support SAFTENG:

Since 2012
Since 2025
Since 2010
Since 2025
Since 2025
Since 2025
Since 2025
Nuclear industry's take on HOP's Five Principles
Human Performance Improvement (HPI) is the systematic process of determining desired performance, continually monitoring performance, discovering and analyzing performance gaps, designing and developing effective interventions, implementing these interventions, and continually evaluating the results of improvement interventions within performance monitoring to ensure that the improvement process takes...
Read More
Deep dive into HFE with the NRC's Human Factors Information System (HFIS)
Humans are integral to the safe operation of a nuclear power plant. In the late 1970s, NRC began to focus on protecting and ensuring adequate training of plant staff to perform their assigned tasks. The NRC studied factors affecting performance, such as the effects of shift work on health and whether control room simulators would improve training. As a result of this focus, NRC created the Human Factors...
Read More
Entry into PRCS's protected by a fixed fire protection system
I could have sworn I had already written about this hazard, but I’m guessing it was inside one of my social media groups.  So BUCKLE UP, Buttercup, as this is going to make a lot of folks unhappy.  Question:  Do I have to isolate my fixed fire suppression system protecting my PRCS? … HomeRead More »
Read More
59006 150673118296885_100000625941124_304661_2996054_n
The power of a vacuum (photo)
What happens when you try to pull water out of a tank using a 3HP pump and leave the vent closed … HomeRead More »
Read More
Hydro test brittle frac1
Brittle Fracture (Catastrophic) Failure during HYDROTEST of Propane Bullet
I have posted numerous fatal accidents that occurred during the pressure testing of piping and pressure vessels.  Although hydrostatic testing involves less energy release should something fail vs. using pneumatic pressure, the hazard(s) are still HUGE and must be respected.  This incident involved a propane bullet built in 1994 and placed into service in 1996, so do not think this was some...
Read More
Hydrostatic test of a cooling coil for an air-cooled heat exchanger fatality (OK-FACE)
A 43-year-old assemblyman died on May 26, 1999, from chest injuries he received earlier that day when struck by a high-pressure water jet emitted after the failure of a gasket during a hydrostatic test of a cooling coil for an air-cooled heat exchanger. At the time of the incident, the victim was part of a two-man team conducting hydrostatic testing at a heat exchanger manufacturing company. The laborer...
Read More
What is a process?
A process, in terms of Process Safety Management, is defined as:  “Any activity involving a regulated substance including any use, storage, manufacturing, handling or on-site movement of such substances, or any combination of these activities. For the purposes of this definition, any group of vessels that are interconnected, or separate vessels that are located such that a regulated...
Read More
Fire Watch for your roofing contractor may have a 2-hr requirement
One of the debates we routinely have with fellow process safety professionals is the adoption of NFPA 51B vs. meeting 1910.252(a) requirements for their Hot Work safe work practice. I am a huge fan of NFPA 51B, as it is much more up-to-date than OSHA’s 1910.252, which, by the way, was based on the first edition of NFPA 51B in 1962. As I have stated many times before, PSM (nor RMP) does NOT allow...
Read More
Massive Leak of Liquefied Chlorine Gas (Henderson, NV 1991)
A massive leak of liquefied chlorine gas created a dangerous cloud of poison gas over the city of Henderson, Nevada, in the early morning hours of May 6, 1991. Over 200 persons were examined at a local hospital for respiratory distress caused by inhalation of the chlorine, and approximately 30 were admitted for treatment. Some 700 persons were taken to shelters. It is estimated that from 2,000 to 7,000...
Read More
The advantage of utilizing a Contractor Work Permit
Those of us living within the realm of Process Safety Management know all too well the difficulty of controlling contractor work activities to a level that we are confident they are not increasing our process risks beyond our acceptable levels. Many contractors are offended by the fact that many PSM programs have multiple layers of protection regarding their presence and work practices in, on, or even...
Read More
Sample Protocol for a Response Plan (General Outline)
Industrial Incident Guidelines for Incident Command Arrival on Scene, Initiation of Response, see: Agent Identification Quick identification by signs/symptoms: CHEMM-IST Substance identification: WISER Acute Patient Care Guidelines Estimation of Protective Distance/Threat Zone On-site Activities Triage Guidelines Hospital Activities Personal Protective Equipment General Guidelines for Responding...
Read More
What does "relief system design basis" mean?
Relief systems include, but are not limited to, relief valves, relief headers, relief drums, and rupture disks. Design basis means documenting how the loads and sizes of the relief system and inlet and outlet sizes were determined. This includes: … HomeRead More »
Read More