Bryan Haywood

Argon used in welding asphyxiates welder in 24″ pipe

At 1:30 p.m. on April 19, 2022, an employee, 35, was back welding inside a spool vessel (titanium pipe) that was 24 inches in diameter. The employee was asphyxiated due to the displacement of oxygen by argon gas…. Membership Required You must be a member to access this content.View Membership LevelsAlready a member? Log in...

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here

Two employees entered a 21″ sewer manhole that was oxygen deficient

At 4:15 p.m. on June 14, 2022, two employees entered a 21-inch sewer manhole to conduct vacuum testing, not knowing that it was oxygen deficient. Both employees were overcome and died…. Membership Required You must be a member to access this content.View Membership LevelsAlready a member? Log in here...

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here

Emptying and Cleaning an open-topped frack tank results in two fatalities (H2S suspected)

At 8:00 a.m. on June 26, 2022, two employees, 45 and 46, were emptying and cleaning an open-topped frack tank (Tank #4) at an oil and gas services site. There were no eyewitnesses and the employees were working at a remote site by themselves, so few details are known about what occurred…. Membership Required You...

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here

Lack of knowing where energy isolation device was located resulted in electrocution

At 1:45 p.m. on July 18, 2022, an employee, 51, was preparing to replace an ice machine at a retail store. The employee searched for the electrical panel to de-energize the ice machine but could not locate it. The employee was employed by a refrigeration equipment company and did not work at the retail store…....

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here

Fixed Fire Protection system asphyxiates supervisor

At 1:30 p.m. on August 7, 2022, an employee worked as a production supervisor in his office when the deluge system alarm was activated. Approximately 30 seconds after the audible alarm was engaged, the foam generators were activated and began to disperse 2.2% high expansion foam.  The employee attempted to exit his office to reach…...

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here

Demo’ing a Combustible Dust Collection System leads to fatal explosion

At 4:00 p.m. on July 4, 2022, an employee was cutting off a motor and base of a dust collection system using an oxygen-acetylene torch at a farm machinery and equipment manufacturing facility. When the employee moved the cutoff motor base, a dust cloud formed and ignited, causing an explosion. The employee sustained second and…...

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here

Line Break Gone Wrong… Employee burns hand after disconnecting nuts on pressurized NH3 line

At approximately 9:00 a.m. on March 15, 2022, an employee, 30, disconnected nuts to a line for service and repair work. The employee was working to depressurize lines of ammonia for service work. The team had isolated, performed proper lockout/ tagout, and bled the line assigned for work off. The employee began disconnecting nuts on…...

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here

Safety Thought of the Week… incubating accidents

This is a great synopsis of how serious accidents build within an organization over time because of the lack of a functioning SMS. When reading this, think “swiss cheese model” from Reason and the “domino model” from Heinrich. Disasters are essentially organized events. To occur, they typically require the systemic and prolonged neglect of varying…...

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here

Safety Thought of the Week … Disasters are essentially organized events

This is a great synopsis of how serious accidents build within an organization over time because of the lack of a functioning SMS. When reading this, think “swiss cheese model” from Reason and the “domino model” from Heinrich. Disasters are essentially organized events. To occur, they typically require the systemic and prolonged neglect of varying…...

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here

Flanged joint pressure and tightness testing

When a facility’s hazardous materials piping is assembled with bolted flanged joints, it needs a maintenance procedure to properly assemble and disassemble these flanged joints.  Along with this procedure, a means to pressure/leak test the bolted flanged joint must be used to ensure leak tightness. Subject to code/regulatory requirements, the worker should establish:… Membership Required...

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here

Well-written safety programs are foundational to an SMS – not a bureaucracy in safety management

A movement within the safety community, primarily online banter, somehow finds fault with a WRITTEN safety management system (SMS).  There are even books published on the topic that are being pushed, decrying written programs as a bureaucratic waste of time, too controlling, no value added, etc.  I find this very sad, but they do have…...

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here

Does your “Line Break Safe Work Practice” meet or exceed ASME PCC-1

ASME PCC-1, Guidelines for Pressure Boundary Bolted Flange Joint Assembly, is a MUST have (and read) for process safety professionals managing piping systems that have bolted flanged joints.  In fact, Chapter 15, JOINT DISASSEMBLY, has some specific requirements that a facility should adopt as part of its Line Break SWP for flanged joints. HINT: the…...

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here
Scroll to Top