Free

FAILURES of true “facility siting” – our “zoning” process is broken and dangerous!

Having spent my entire safety career in chemicals, I have always been amazed when communities rezone and permit housing developments such as apartments/condos with high density populations within spitting distance of chemical/processing facilities and then the city officials are furious when there is an event that causes disruption in these housing developments.  This story is […]

EPA RMP citations @ speciality chemical plant (C3H6O, NH3, C6H13N & $27K)

Respondent is the owner and/or operator of the Facility and has developed an RMProgram accidental release prevention program for the Facility. On July 23, 2019 – July 25, 2019, the EPA conducted an on-site inspection of the RMProgram related records and equipment for the purpose of assessing the Respondent’s compliance with the RMProgram requirements and

Flow Velocities and Flammable Liquids

The major hazard involved with transferring flammable liquids is static build-up due to charge separation with the potential for discharge resulting in fire and subsequent loss of containment. Certain non-polar liquids can be charged while flowing through piping. Detectable and hazardous charges must be expected if the specific resistance of the liquid exceeds 108 ohms.

Preparing a process for “opening”

One of the most hazardous tasks that take place within a chemical process is the NON-Routine Opening of the process.  And sadly, there are no RAGAGEPs or OSHA standards that establish minimum safeguards for such hazardous activities.  Which I guess in some ways, is better as it has allowed the industry to establish some really

Deciphering an IDLH Atmosphere

Almost every safety professional on the planet that works with chemicals, emergency response, and confined spaces knows that the Immediately Dangerous to Life and Health (IDLH) exposure is a game changer!  But so many also struggle with what it means to actually work in an IDLH atmosphere.  In this article, I want to try and

A Double Block and Bleed (DB&B) ARRANGEMENT is different than an API 6D Double Block and Bleed (DB&B) VALVE

I was having your run-of-the-day safety conversation with one of my favorite former OSHA safety engineers and he was quick to point out that one of my articles was not technically “compliant” with OSHA’s 1910.146 requirements when it came to the means we can use to isolate a Permit-Required Confined Space (PRCS).  The means he

It’s the little things that matter with your HAZMAT ventilation systems

Most of us know that a properly designed and installed ventilation system is our FIRST option for controlling hazardous concentrations of flammable vapors, gases, fumes, mists or dust, and volatile or airborne materials posing a health hazard, such as toxic or corrosive materials.  And thankfully, most workstations and areas that need proper ventilation have it

Scroll to Top