Safety Info Posts

Relief valve system failure during unplanned CNG release

Summary On the days leading to January 6, 2014, unusual weather conditions with high-temperature variations caused a large pressure rise inside the three storage vessels at the Brookhaven National Laboratory (BNL) compressed natural gas (CNG) fueling facility. The pressure increase reached the point where the relief valve on each vessel opened automatically and released gas […]

Line Break gone bad (pulling blind flange)

Worker Fatality During Attempted Removal of Blind Flange on Cell 14 Magnet Cooling Water System Summary On October 21, 2015, two National High Magnetic Field Laboratory (NHMFL) mechanical technicians were involved in an incident while attempting to remove a Victaulic blind flange from supply piping on a Magnet Cooling Water (MCW) System. The mechanical technicians

Questions & Answers for OSHA’s Update to the HCS Final Rule

Which establishments are covered by the update to the HCS? The scope and framework of the HCS have not changed with this rulemaking. Chemical manufacturers and importers are still responsible for providing information about the hazards of chemicals they produce or import. All employers with hazardous chemicals in their workplaces continue to be required to

OSHA Recordkeeping Updates

#1 If an employee presents a work status that indicates they are able to perform restricted work or light duty work yet we do not have work available that meets the restrictions, should we enter the number of days under “On Job Transfer or Restriction” or “Away from Work?”

EPA RMP GDC & EPCRA citations @ facility that produces glass-to-metal seals and high-temperature co-fired ceramics (NH3 & $117K)

Respondent operates a facility that produces glass-to-metal seals and high-temperature co-fired ceramics for use in semiconductor products. The Facility is located just over half a mile from a residential neighborhood; just under three-quarters of a mile from a charter school; just over three-quarters of a mile from a church and a skating rink; less than

EPA RMP & GDC citations @ facility manufacturing chlorine, bleach, and hydrochloric acid ($85K w/ two SEPs @ $264K & $98K)

Respondent operates a facility to manufacture chlorine, bleach, and hydrochloric acid. At all times relevant to this CAFO, Respondent produced, used, or stored more than 2,500 pounds of chlorine at the Facility and was subject to the requirements of CAA § 112(r)(7). At all times relevant to this CAFO, Respondent produced, used, or stored hydrogen