Establishing Pipe Class for PSM Flammable Liquid Process

Using the piping inspection RAGAGEP API 570, one of the first steps in our piping inspections/testing is to establish the “Class” our piping fits into. In most cases, I advise my clients to classify their PSM/RMP-covered piping as Class 1. However, there is a possibility that some flammable liquid piping could be classified in a…...

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here

Controlling hazards associated with mobile equipment around processes

Those who know me or have been following my rants for years know my love of Bollards and Jersey Barriers. These simple devices (e.g., PASSIVE engineering controls) can prevent a lot of contact between mobile equipment and process/equipment. But as shown in the image below, Aerial Devices such as JLGs can reach OVER safety barriers,…...

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here

Facility Siting 101 – 25′ safe distance – vapors travel along ground (Video)

Take notice… single hose. Means liquid gasoline is going in the tank, but where are the vapors going if there is not a vapor return hose back to the truck? ALSO, the tank has an atmospheric vent pipe somewhere so as to vent vapor pressure should the tank get warmer and the gasoline Vp increases…....

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here

Are we missing the mark when it comes to 1910.120(q)(3)(vi)

Most response groups practice the 2-in/2-out rule during a HAZMAT response. But the devil is in the details when complying with 1910.120(q)(3)(vi). How many have attempted to pick up a grown man, weighing 200+ pounds, while they are donned in a wet Level A suit and carry them out of the Hot/Warm Zone? I can…...

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here

Nondestructive Examination in Lieu of Pressure Testing for Repairs and Alterations

This can be a sensitive topic at many facilities. I was raised to believe that whenever the pressure-retaining boundary is physically broken during line or equipment opening tasks, the line or equipment MUST be pressure- and leak-tested before being returned to service. I get a lot of hate mail and even more weird looks when…...

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here

A useful interpretation of ASME B31.3 Pressure/Leak testing

Does the fabricator of a B31.3 piping system still have to pressure test components that are manufactured to a standard listed in Table 326.1 when that standard states that the component is hydrotested as a requirement of the standard?… Membership Required You must be a member to access this content.View Membership LevelsAlready a member? Log...

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here

Riding a load and working underneath suspended load (video)

I sure hope I am being duped by Ai once again, as this video has NO place in the year 2025! We can not make this stuff up, which leads me to wonder if this is fake. Their reaction seems a bit off, assuming the two workers under the load were killed or seriously injured…....

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here

State Fire Codes Performance-based Design Alternative (PSM/RMP Model – 2024 Updates)

To quote the IFC committee, “the purpose of performance-based design criteria is to promote innovative, flexible and responsive solutions that optimize the expenditure and consumption of resources while preserving social and economic value.”  Section 5001.3 Performance-Based Design Alternative is intended to be compatible with EPA’s RMP and OSHA’s PSM requirements, so it would reduce the burden…...

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here

LPG Hose Failure (Video)

In the video, you can see the gas company employees placing the ladder and pulling the hose that runs from the unit with the pipe. In an instant, the hose apparently ruptured, and it shot out; even the final section of the hose, where the dispensing pump is located, was about to hit another worker,…...

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here

Line Break gone bad (H2 & Contractors)

10/28/25 UPDATE: Hydrogen (H2) FATAL Line Break RIP 𝙒𝙝𝙖𝙩 𝙝𝙖𝙥𝙥𝙚𝙣𝙚𝙙? The two deceased workers, identified as Mr K (43) and Mr A (50s), were subcontractors conducting scheduled maintenance on a hydrogen pipeline. The task involved inserting a blocking plate into a pipeline to isolate flow, a process requiring the loosening of flange bolts. The explosion…...

Membership Required

You must be a member to access this content.

View Membership Levels

Already a member? Log in here