Safety Info Posts

What does AI say about the old saying, “three threads showing” for nuts and bolts on our process?

I have this debate regularly with facilities where I find “short-threading” on their flanges/manways, etc. This phrase is from an old pipe-fitters manual, and it’s what I was taught in 1993 when I entered the chemical process industry and PSM/RMP covered processes. Today, “full engagement” is defined at the bolt/nut being FLUSH. So I asked

Temporary SOP, Car Seals or BOTH?

What would you require for this bypass around a safety critical valve? Temporary SOP, Car Seals or BOTH? The automated valve is the Emergency Shutoff Valve tied to a Hi-Hi Interlock on an above-ground atmospheric flammable liquid storage tank. The LOPC/Over-Fill event occurred because the worker filling the tank was “shorthanded” that day and had

Auditing, Inspecting, Verifying Safeguards (Railings)

I often discuss how organizations need to audit, inspect, and verify their safeguards to either reduce the probability or severity of an undesired event. Most safety professionals are accustomed to auditing our safe work practices, behaviors, and other related aspects. In Process Safety, most safety engineers are accustomed to conducting annual functional testing of their

British Columbia: Adoption of Boiler, Pressure Vessel, and Refrigeration Codes

Big changes in the Province of British Columbia for boilers, pressure vessels, and NH3 refrigeration processes. The Province has published Ministerial Order M225-2024 that provides amendments to the Power Engineers, Boiler, Pressure Vessel and Refrigeration Safety Regulation (PEBPVRSR). These amendments will update the Schedule to the PEBPVRSR by adopting the new editions of the codes.

Scroll to Top