Permit Required Confined Spaces

Is a Roll-Off Trash Compactor a PRCS?

In evaluating these spaces, we first have to determine if they are a Confined Space.  Evaluating the compactor shown below, we have to ask ourselves, as it sits there today, does the space meet the definition of a Confined Space? OSHA defines a confined space as a space that: Is large enough and so configured […]

PRCS Ventilation Straight Edge Tool

We have all seen a blower the size of a lunch box attempting to ventilate a 500,000-gallon vessel!  The permit calls for a “blower,” so to meet the permit conditions; the team grabs the nearest available blower and NOT necessarily the CORRECT BLOWER!  However, on the other side of the argument, most written CS entry

WorkSafeBC has ammended their PRCS Std… all agencies need to do this

EVERY business that has workers entering Permit-Required Confined Spaces should seriously consider updating their written program to include this type of detail and specifications.  COUPLED WITH OSHA’s 1910.146, these requirements regarding the means used to isolate the space and test the atmosphere are an EXCEPTIONAL improvement over OSHA’s basic definition of “isolation” and atmospheric testing.

OSHA explains their expectations for RESCUE from permit-required confined spaces (1910.146(k)

Most of the permit-required confined space standard requirements are in place to ensure that employees can safely enter and work inside permit spaces. The hazards within the space MUST be eliminated or controlled BEFORE entry is allowed. Testing and monitoring MUST be performed in order to ensure that entry conditions are acceptable before entry and that

Using 1910.146(c)(7) as your entry method into a Permit-Required Confined Space

There is significant confusion among businesses about how the “reclassification” method under 1910.146(c)(7) should be applied. I always suggest that safety professionals take the time to read OSHA’s preamble to any standard that has one. The preamble to 1910.146 is an EXCELLENT source of information, as it is where OSHA justifies the requirements in the

Scroll to Top